What Is a Change Order? How to Use It to Protect Your Business

As you prepare for your California contractor license exam, understanding the ins and outs of change orders is not just about passing a test, it’s about protecting your business, your clients, and your reputation. In the dynamic world of construction, projects rarely go exactly as planned. Surprises on the jobsite, shifting client priorities, and unforeseen conditions are all part of the landscape. That’s where change orders come in, serving as your essential safety net. This article will walk you through what a change order is, why it matters, and how to use it effectively to safeguard your business.

The Basics of Change Orders

A change order is a formal document that modifies the original construction contract, detailing any changes to the scope of work, project cost, or timeline. It is signed by all relevant parties, typically the owner, contractor, and architect, and serves as a legal record of the agreed-upon changes. Change orders are not just for correcting mistakes; they are a standard part of construction management, used to address everything from owner-driven design tweaks to unexpected site conditions like hidden pipes or hazardous materials.

Think of a change order as a contract amendment. If the homeowner suddenly wants hardwood floors instead of laminate, or if you discover water damage during demolition that requires additional repairs, a change order ensures everyone is on the same page about what’s changing, how much it will cost, and how it will affect the schedule. Without a change order, you risk disputes, misunderstandings, and even financial loss.

Why Change Orders Are Essential for California Contractors

In California, the stakes for proper documentation are especially high. The law is clear: verbal agreements and handshake deals are not enough. If a dispute arises over additional work, material substitutions, or project delays, only a written change order will hold up in court. California’s Contractor’s Licensing Board and state regulations require that all changes to approved plans or specifications after the contract is signed must be made through a formal change order, signed by the appropriate parties.

Consider this scenario: You’re halfway through a kitchen remodel when the client asks for a custom island. If you proceed without a written change order, you may end up footing the bill for the extra materials and labor if the client later refuses to pay. On the other hand, a properly executed change order protects you from such risks, ensuring you get paid for every bit of work you do.

How to Use Change Orders Effectively

To make the most of change orders, you need a clear, structured process. Start by identifying the need for a change. This could come from the client, a site condition, or a design update. Document the change thoroughly, describe what’s changing, why, and how it will affect the project’s cost and timeline.

Next, prepare the change order request. Use a standard form, like the AIA Document G701™-2017, to keep your documentation consistent and professional1. Include a detailed description of the work, a cost breakdown, and any adjustments to the schedule. Attach supporting documents such as revised drawings or photos if needed.

Submit the change order to the client for review and approval. Discuss the implications openly, and be prepared to answer questions. Only proceed with the new work once the change order is signed by all parties. This step is crucial, starting work without a signed change order can leave you vulnerable to disputes and unpaid invoices.

Finally, keep meticulous records. Maintain a log of all change orders, including dates, descriptions, and approvals. Store supporting documents and communication records for future reference. This documentation will be invaluable if a dispute arises or if you need to justify your work to regulators or clients.

Practical Tips and Industry Insights

Here are some actionable tips to help you manage change orders like a pro:

  • Communicate Early and Often: Don’t wait to deliver bad news. If a change is needed, inform the client immediately. Clear, timely communication builds trust and prevents surprises down the road.
  • Set Clear Expectations: From the outset, explain to clients that change orders are a normal part of construction. Outline your process for handling changes, and provide examples so clients know what to expect.
  • Get Everything in Writing: Never rely on verbal agreements. Every change, no matter how small, should be documented and signed.
  • Use Technology: Consider using construction management software to streamline your change order process. Digital tools can help you track changes, collect electronic signatures, and keep all your documentation organized.
  • Know Your Authority: Make sure you understand who has the authority to sign change orders for each project. This could be the owner, a property manager, or another designated representative.

Real-World Examples

Let’s look at two common scenarios where change orders are essential:

Example 1: Unforeseen Site Conditions
During a bathroom renovation, you discover mold behind the walls. This requires additional remediation work not included in the original contract. You prepare a change order detailing the extra work, the added cost, and the extended timeline. The client signs off, and you proceed with confidence, knowing you’ll be compensated for the extra effort.

Example 2: Owner-Requested Upgrades
A homeowner decides mid-project to upgrade from standard countertops to quartz. You draft a change order outlining the new material, the additional cost, and any impact on the schedule. The client approves, and you move forward without risking a dispute over payment or project scope.

Conclusion

Mastering change orders is a critical skill for any contractor preparing for their California license exam, and for anyone who wants to run a successful, dispute-free business. Change orders protect you from financial loss, legal trouble, and damaged client relationships. By establishing a clear process, communicating openly, and documenting everything, you can navigate the inevitable changes of construction with confidence and professionalism. Remember: in California, the written word is your best defense. Make change orders a cornerstone of your business practice, and you’ll be well on your way to a thriving career in construction.

This entry was posted in Construction, Contractor Business, Tips on by .

About CSLS

Contractors State License Service (CSLS) is the largest school in California devoted to the Construction professional. For over 23 years, CSLS has helped its students pass the exam to become licensed contractors in the State of California, licensing more students than any other school. From our main offices in Southern California, CSLS operates over 25 locations with full-service support and classrooms. We have grown to this extent by providing quality, professional services. In comparison, this provides 7 times the number of convenient locations than the second largest contractor school. Contractors State License Services is one of the only contractor schools in the state that is run by educators, not lawyers or people mostly interested in the bonding and insurance business. Contractors State License Services formerly operated under the oversight of the State of California's Bureau for Private Post Secondary and Vocational Education. As of January 1 2010, the new Bureau for Private Postsecondary Education (BPPE) came into existence replacing the BPPVE. CSLS now operates under the provisions of the California Private Postsecondary Education Act of 2009 (CPPEA), Article 4 Section 94874(f). Our Mission is simple; We can help you pass your California Contractors License Exam. Celebrating our 25th year, CSLS has helped over 120,000 students pass the California contractor licensing exam to become licensed contractors in the State of California. Additionally, we offer complete home study and online contractor’s license programs to help you pass your California contractors license exam. CSLS offers licensing classes for all types of contractor licenses, including General Engineering Contractor, General Building Contractor, Specialty Contractor, Insulation and Acoustical Contractor, Framing and Rough Carpentry Contractor, Cabinet, Millwork and Finish Carpentry Contractor, Concrete Contractor, Drywall Contractor, Electrical Contractor, Elevator Contractor, Landscaping Contractor, Warm-Air Heating, Ventilating and Air-Conditioning Contractor, and many others. For a complete list of contractor licenses, visit www.MakeMeAContractor.com and tuned for more informative posts.